Fort Macon State Park

  • Banner image for:

  • Heart Pine Flooring in a historic fort is preserved for future generations

    Architect: Hobbs Architects, PA

    General Contractor: L.A. Downey and Son, Inc.

    Photos: Joey Tyson

    Floor: Long Leaf Heart Pine

    Surface treatment

    Basic treatment: Diamond Oil Active Natural

  • Fort Macon was built by the Army Corp of Engineers and completed in 1834.

    Active during the Civil War, the Reconstruction, and the Spanish-American War, it was finally sold to the state of North Carolina in 1924 for $1.00.

    It became a state park in 1936.

  • Banner image for:

  • Banner image for:

  • Banner image for:

  • The Visitor Center and Museum original wood flooring suffered damage beyond repair from Hurricane Florence.

    8000 sf of Select Quarter Sawn Old Growth Heart Pine was sourced for the new flooring and WOCA Diamond Oil Active in Natural was chosen as the finish.

  • The choice to finish with WOCA Diamond Oil Active was a forethought for the busy visitor center and museum.

    The park has 1.3 million visitors every year.

    The floor never has to be sanded and refinished again. It can be cleaned and another coat of Diamond Oil Active applied, avoiding closing for lengthy periods of time and costly labor.

  • Banner image for:

Project products

Footer image

© 2024 WOCA USA, Powered by Shopify

Login

Forgot your password?

Don't have an account yet?
Create account